WE CREATE SOLUTIONS

Optimized Solutions for Your tasks 

ASH

2016~2018
  • ASH HANDLING SYSTEM, POESUNG ENERGY THERMAL POWER PLANT, 43 MWe (EP PROJECT)
  • ONE(1) X 400 M3 FLY ASH STORAGE SILO SYSTEM
  • ONE(1) X 50 M3 BOTTOM ASH STORAGE SILO SYSTEM
  • TWELVE(12) X 8 T/H FLY ASH DENSE PNEUMATIC CONVEYNG SYSTEM
  • ONE(1) X 5 T/H BOTTOM ASH DENSE PNEUMATIC CONVEYNG SYSTEM
  • TWO(2) X 10 T/H BOTTOM COOLING SYSTEM
  • ONE(1) X 10 T/H VIBRATING SCREEN & DUST COLLECTION SYSTEM
  • ELECTRIC & CONTROL SYSTEM
2014~2016
  • ASH HANDLING SYSTEM, SEOKMUN ENERGY THERMAL POWER PLANT, 40 MWe (EP PROJECT)
  • ONE(1) X 1000 M3 FLY ASH STORAGE SILO SYSTEM
  • ONE(1) X 30 M3 BOTTOM ASH STORAGE SILO SYSTEM
  • ELEVEN(11) X 10 T/H FLY ASH DENSE PNEUMATIC CONVEYNG SYSTEM
  • ONE(1) X 5 T/H BOTTOM ASH DENSE PNEUMATIC CONVEYNG SYSTEM
  • TWO(2) X 10 T/H BOTTOM COOLING SYSTEM
  • ONE(1) X 10 T/H VIBRATING SCREEN & DUST COLLECTION SYSTEM
  • ELECTRIC & CONTROL SYSTEM
2015~2017
  • ASH HANDLING SYSTEM, SUNG LIM ENERGY THERMAL POWER PLANT 10 MWe (EP PROJECT)
  • ONE(1) X 250 M3 FLY ASH STORAGE SILO SYSTEM
  • ONE(1) X 10 M3 BOTTOM ASH STORAGE SILO SYSTEM
  • THREE(3) X 5 T/H FLY ASH DENSE PNEUMATIC CONVEYNG SYSTEM
  • ONE(1) X 5 T/H BOTTOM ASH DENSE PNEUMATIC CONVEYNG SYSTEM
  • TWO(2) X 10 T/H BOTTOM COOLING SYSTEM
  • ONE(1) X 10 T/H VIBRATING SCREEN & DUST COLLECTION SYSTEM
  • ELECTRIC & CONTROL SYSTEM
2015~2017
  • ASH HANDLING SYSTEM, GWANGJU INTEGRATED THERMAL POWER PLANT 20 MWe (EPC PROJECT)
  • TWO(2) X 300 M3 FLY ASH STORAGE SILO SYSTEM
  • ONE(1) X 10 M3 BOTTOM ASH STORAGE SILO SYSTEM
  • FIFTEEN(15) X 10 T/H FLY ASH DENSE PNEUMATIC CONVEYNG SYSTEM
  • ONE(1) X 5 T/H BOTTOM ASH DENSE PNEUMATIC CONVEYNG SYSTEM
  • TWO(2) X 10 T/H BOTTOM COOLING SYSTEM
  • ONE(1) X 10 T/H VIBRATING SCREEN & DUST COLLECTION SYSTEM
  • ELECTRIC & CONTROL SYSTEM
2014
  • WONJU RFD POWER PLANT, SOUTH KOREA